Posts

Greenbrook Design Center

***Latest  Post Update 09/16/2017

We are making PROGRESS at the Design Center!

We are excited to share with you our

DECISIONS, DETAILS, & DESIGN ideas!

Opening Fall 2017 to Uptown Shelby!

 

Greenbrook Design, Kitchen & Bath Home Design Center

Inside the Design Center, you will find a unique one-of-a-kind showroom. The kitchen and bath home design center will be sure to appeal to homeowners, interior designers as well as contractors. Plan to be intrigued and watch us GROW in Uptown Shelby.

We are excited to be under construction! Stay up-to-date with what’s happening as we share more details on this page! 

Our Journey to Uptown Shelby

Location Address: 112-1 North Lafayette St. Shelby NC 28150

Construction has officially started! This is formally known as part of the Campbell building.

Here is a sidewalk view (before) of the Design Center. We have great plans in the works.

outside of showroom

Storefront prior to construction.

 

Update 9/16/2017

Another great week of progress!

If you look back through this post – you notice that I keep the most recent updates at the top. A year ago on 9/17/2016, I made a post about how the work had stalled. Things are finally happening at the Design Center and we can’t wait to be able to move into our new space.

Saturday work & Saturday surprises.

We have been working lot’s of Saturdays here at Walker Woodworking. Not only do we have a packed production schedule, we also have  design center items to make. One of my early visions for this building was the exterior. We were unable to make some of the changes I wanted because of the historic preservation rules. But I felt that the doors just looked so common and small compared to the massive size of the windows. My idea was to bring in taller wood framed doors and I volunteered Travis to make them (he wasn’t thrilled about that idea at all). I talked to him into getting it done, knowing that in the end, it would be something he would be proud of that he personally had a hand in making. Travis delivered the doors yesterday (Friday) and today we went by so that our daughters could see the progress. We were pleasantly surprised to see the doors getting installed and another step toward getting this project completed.

Mahogany doors being built in our shop and what they look like the day of installation. There were four doors total to make and the sizes 3′ wide by 8.5′ tall. Travis did the majority of the work on these with help from Brandon Fitzmorris (not pictured) Chris Masters and Justin Webb (not pictured).

Display cabinets get installed.

We have had a huge warehouse full of cabinets, lights, sinks, hardware displays and all sorts of things that we have collected over the last two years for this project. So when we started loading up the truck to take to the showroom to be installed – it was a really exciting moment for me. I won’t lie – I have been impatient and I am ready to get moved in. The gray cabinets are for our Wellborn display and the white cabinets are Dura Supreme.  These are the 2 semi-custom cabinet lines we will be offering.

Cabinet Install – Phase 1

 

 

Update 09/05/2017

Floors – A big decision!

One of the things I have learned during this whole process is that I can’t always let my personal preferences lead my decisions. I really wanted a stain on these floors because I really love to see color in wood finishes.  I would have been happy with just about any stain color but the light gray was my favorite. I ultimately decided to go natural for two reasons, I felt that over time the lighter finish would be the most neutral and organic color to work our displays and decor around. The other reason I went with natural is that I felt it stayed true to the original elements of the building. I am so glad I went with the natural finish, these floors are truly beautiful and full of history.  I would love to hear your thoughts – comment below!

 

Floors before and during finishing.  The final decision of stain choice was to go with Natural!

Floors after.

You may notice in the showroom, there are actually three different types of wood used.  Maple, Pine, & Oak.   Over the years and due to multiple renovatons, the flooring is what adds so much character to our space.

 

Update 8/20/2017

Ceilings get a makeover in white.

I had few people tell me that I should keep the ceilings black but I just couldn’t do it. I am actually a big fan of black ceilings I have black ceilings in my basement, most showrooms have black ceilings but for me, changing the ceiling back to white was the easiest decisions I have made so far. Without a doubt, these ceilings make this building. They are original to the building and something we needed to show off. It has been amazing at how much bigger and brighter the space is.

Here is a before and after of the ceilings before the lights were installed. The before and after photos were all with natural light from outside.

 

Update 07/17/2017

We are finally seeing progress to get excited about!

This has for sure been a test of patience for us over the last 2 years but I am happy to announce that things have been moving along again. Of course, if you have been following our social media sites you already noticed! Although things have been slow to move along, this week we will begin to see lots of progress.  Some of the major things to be done include installing windows and doors which mean there is some interior and exterior work to finish up.

In order to keep the historical preservation of the building, several of these interior and exterior items had to be special ordered. Although we don’t own the building, keeping true to these historical elements is important to us as well.  Once the doors and windows are installed, we hope to start seeing some paint on the walls and ceilings and trim work getting done. From there, things should move relatively quick. This also means that Walker Woodworking will be busy building some specialty items as well.

For the latest information, we suggest that you follow us on social media. With the new ‘stories’ on Instagram, we are able to introduce more behind the scene pictures with captions, which tell you more about the locations and pictures as you view them. We usually visit daily and post updates.

Interior tile work was completed last week.

 

 

Update 9/17/2016

And the work has stalled…

Construction of our Design Center has been stopped temporarily due to a Federal Grant approval process. Stay tuned, construction is scheduled to resume November 3rd.

Meanwhile, our team is still making plans, making selections and getting excited about moving to Uptown Shelby.

 

Making Selections

The process of making selections as been underway for a while now but there is still lots to do. We thought it would be interesting to see how we take certain design elements and put them together for the final product. Often times HGTV makes the construction and remodel process look fast and easy in a 30 minute TV show, but the reality is a much longer and very complex process. A lot of time and thought from multiple sources of professionals goes into making a project of this proportion come to life.

Tile

This past week we went tile shopping; Brandon, Wendi and I (Stacey) spent a day visiting several tile centers – 5 in all. We have several areas that we will need to select tile. The construction plans will be adding bathrooms and office space. Although we made some progress we still have a lot more to do and more to select. Here is a peek at some of the fun things we found.  Did you know Charlotte has so many great tile centers? Daltile, Emser, Florida Tile, The Tile Collection, & Crossville Tile.

 

 

Update 5/21/2016

And the work begins…

Construction officially started in early March, and the bulk of that time has been spent in the basement. More updates coming soon.

SR before ad

View from the mezzanine to the main showroom floor.

 

 

 Original Post 5/13/2016

How we got here…

When Travis and I purchased a CNC Router at the end of 2013, we never imagined how much things would change for us and our business with Walker Woodworking. We certainly had much to learn and we definitely had many challenges to overcome, but we will save that story for another day.  The CNC router enabled us to take our company to a new level with innovation and technology and while we have embraced these changes, we also had new needs that our current space could not provide.

Learning the CNC software and getting the process up and going was initiated by Brandon Fitzmorris. Brandon was our lead engineer and helped through the initial transition. As many people may remember, our designer at the time in 2013 & 2014 was Jeneane Beaver. Jeneane had just had her first child and with another on the way she decided that she wanted to stay home and be with her kids; a decision that we respected but it left us in a position to find a suitable replacement. Brandon was eager to accept the challenge and therefore we had yet another position to fill. By the end of 2014, we had Brandon in his position as Designer and a new engineer in place, with the need for an additional engineer.

Travis and I had been debating ideas to build a new shop or open a new showroom. While we were not necessarily making any immediate plans for one or the other, we were approached in the early summer of May 2015 by excited new owners of a building in Uptown Shelby. They had heard that we may be looking for space and we were very eager to see the space. Soon after we were signing a lease. Since that time we have been patiently waiting for the process of architects, engineers, and permits from the City of Shelby to run its course. Planning the space with the owners took some time, but we are thrilled with the end results.

Meanwhile, we have been making necessary staff changes in anticipation of this new showroom. Adding staff in space you don’t have has certainly put a strain on our working environment but we became creative and made temporary adjustments to make it work.  Over the last year we have added to our staff: Jan Blanton – Design Assistant, Tyler Triplett – Engineer, and most recently Ryanne Turner – Design Assistant. Marie Walker, a longtime administrative assistant,  is patiently awaiting the new showroom to have her own office. During this transition, she has moved to a home-based office with me (Stacey Walker) and continues with day-to-day duties.  We are all looking forward to the new Design Center.

A Little History…

Full view

Campbell Building – full corner view

The Design center building itself is located right on the corner beside of First Baptist Church. Originally, construction started on the building in 1928 and was completed in 1929. The first use was a general store, then it became a pharmacy and had a little restaurant in the mezzanine area. It was later a furniture store and they sold toys in the basement area. Within the past 10 years, the last to use the building was a furniture store. As far as we know the 2 upper floors have never been used for much except storage.

Over the years the building was handed down to generations of the same family. The new owners are the first ones to actually purchase the building. Kay, the previous owner, is the great-granddaughter of the men who built the building. One was a steelmaker and another owned a brick factory and these two men had children that married each other. That couple had a child, and that child was the parent of Kay and Edgar.

At one point in time,  all the stairs and railings were painted bright orange! A few years back, Edgar took all that paint off himself and refinished each of the railings and banisters on site. (*Please feel free to comment in the feed if you have any other information about the historic building, we want to give as much accurate information as possible about the building)

The interior of this building has some great features that are original to the building that we want to preserve and maintain as much as we possibly can. From the original tin ceilings, the beautiful wooden staircases, and the pine floors. We worked diligently with the owners & architects to help make this happen, but in order to bring the building up to date with today’s codes, there will be a big transition in some areas inside and out that can’t be avoided. In the near future, the upper floors will be renovated as well. The 2nd floor will be Uptown Indigo – an event space and the 3rd floor will be the residence of the building owners.

CampbellsAd2pg

Old Newspaper – Campbell Building

CampbellsAd

Old Ads From Furniture Store

CampbellsAd(Steel)

Old Newspaper Ad

 

 

 

Follow us on Facebook & Instagram – #walkerwoodworking #greenbrookdesign #uptownshelby #shelbync for more photos and event updates!

 

photo of camera on a tripod at photo shoot

On a Photo Shoot

On a Photo Shoot

Last week I went out to do a photo shoot at a beautiful home in Walnut Cove near Asheville, NC. with my side kick @Marie Walker. We got so carried away with snapping pictures in the kitchen that I forgot to get a few with my iPhone- which I really like to do. I just can’t explain how much fun taking pictures can be when the lighting is just right. It saves us so much time during the processing phase because we are – after all – just amateurs.

 

desk, crackled finish

Custom crackled finish, by Walker Woodworking

Here is a close up of the desk we did at Walker Woodworking. Yes, this finish is very detailed and required precise attention to get it just right, but overall it really adds character to the desk.

antique distressed mirror gold

Antique distressed mirror with gold, rocks out this custom wet bar.

This area was small and difficult to photograph, I was able to get a close up with my iPhone – this antiqued glass is awesome. It has gold and burnt orange coloring that looks great with the black cabinets.

white cabinets, inset, cup pulls, photo shoot

See the photo gallery for more pictures.

Here’s a sneak peek of the kitchen – we will have these photos added to our website very soon.  You will be able to view the entire project and all the unique details our custom cabinetry has to offer.

It’s always a treat for us to get out of the office and see the final product of our cabinets in the setting of a beautifully furnished home.  We get a chance to actually enjoy time with the homeowner in their atmosphere, rather than in our office always working and discussing details.

Check out our online photo gallery to see more great finished projects.  www.walkerwoodworking.com

Stacey Walker

 

flat surface cooktop,stainless hood,contemporary kitchen,custom cabinets

Jeneane Beaver Kitchen Remodel

Jeneane Beaver Kitchen Remodel

Kitchen & Bath Designer Jeneane Beaver Creates contemporary look for her own 1980’s home.

As a kitchen and bath designer, Jeneane Beaver loved making her clients dream come true.  It was her job to create beautiful and functional spaces every day.  The home her and her husband live in was built in 1980 and the kitchen was not ideal for a person who cooks, nor did the room offer much storage.

Before Photo

Photo by Walker Woodworking Staff – All Rights Reserved.

 

The renovation process began April 12th, and was completed May 18th.  Follow this link to see more before and after photos of this contemporary remodel.

Jeneane Beaver has been designing kitchen and bath cabinetry for Walker Woodworking since 2008. She gained her foundation in cabinet design by earning her Bachelor’s Degree in Interior Design at Western Carolina University and is certified as an Associate Kitchen and Bath Designer through the NKBA. With 6 years of design experience Jeneane is able to truly create unique, user-friendly spaces and educate consumers on the many different cabinetry options available.

“It was hard to see all of those beautiful and functional plans I work on everyday, then go home to a decrepit outdated kitchen in my own home.” says Walker Woodworking designer Jeneane Beaver.

Walker Woodworking Custom Cabinets

Photo by Walker Woodworking Staff – All Rights Reserved.

Planning a budget became a top priority, for the project to move forward. Cabinets, granite, electrical, floors, plumbing, and eating out all became part of our budget.

The wish list:
*drawers around the prep area
*a vented hood
*built in trash and recycling area
*more storage
*space for brooms and ladders
*better functioning cooking appliances
*more countertop space and improved workflow

 

custom storage,drawer style,utensil storage,double decker drawer,dovetail drawer

Photo by Walker Woodworking Staff – All Rights Reserved.

flat surface cooktop,stainless hood,contemporary kitchen,custom cabinets,kitchen island

Photo by Walker Woodworking Staff – All Rights Reserved.

“We are absolutely thrilled with the results. Keeping in style with the house and leaning towards a more contemporary look we went with simplistic darker cabinets and lighter floors to contrast.”

“We know this will greatly add value to our home and it is definitely much nicer to use.  I can now say with pride that I love my kitchen!”  said Jeneane Beaver, Kitchen & Bath designer for Walker Woodworking.

Walker Woodworking can help you make the most of your space and design your Dream Kitchen, give us a call today 704-434-0823! There is no charge for us to provide you with an estimate and set of drawings.

 

Portfolio Items